PROJECT : 370 Km 24”  Gas Pipeline Nawara–Gabes

PROJECT OVERVIEW

EPC  project  (In  JV  With  MS  Italy)  Gas  Pipeline construction for the interconnection of Nawara CPF to the GTP Gabes the projet include Western Gas Pipeline from Nawara to Gabès GTP (370 Km 24”)

  • 2 pig stations (launchers & receivers).
  • 12 block valve stations.
  • Control and Telecommunications Systems
  • Fibre-Optic Cable

Client : OMV

Location : Nawara – Gabes

Completion Date : In Progress

 

PROJECT : 95 Km 20” 75 Km 8” Gas Pipel  Feriana – Gafsa

Project Overview :

Gas Pipeline for the interconnection of Coal mines in the Gafsa valley : Engineering, Procurement, Construction, testing, commissioning and Start-up for 95 Km of 20” & 75 Km of 8” Gas Pipeline From Feriana to Gafsa

Client : STEG

Location  : Coal mines in Gafsa valley

Completion Date : 2016

PROJECT 155 Km 12” Gas Pipeline Gabés – Djerba – Zarzis
Project  Overview :

150 Km of 12” Pipeline from Gabés to Zarziz

Construction , Testing & commissioning of 155 Km of 12 » pipeline from Gabés to Zarzis including:

  • 2 pig stations (launchers & receivers).
  • 5 block valve stations.
  • 2 pig stations (launchers &receives).33 block valve stations block valve stations.Facility & metering system.

Client : STEG
Location : Gabés – Djerba – Zarzis
Completion Date : 2016

 

PROJECT : 8” Pipeline from Hannibal Gas Plant TRAPSA terminal

Project  Overview :

Engineering, Procurement, Construction , Testing & commissioning of 8 » pipeline from Hannibal Gas Plant – TRAPSA Terminal.

  • 58 Km of 8’’ condensate pipeline and associated works from Hannibal plant (sfax) to Trapsa Terminal(Skhira).
  • 2 pig stations (launchers &receives).
  • 33 block valve stations block valve stations.
  • Facility & metering system.

Client : BG TUNISIA

Location : Hannibal Gas Plant-TRAPSA Terminal

Completion Date : 2006

 

PROJECT : LPG & Gas Pipeline

Project  Overview :

  • Hasdrubal Project : 260 Km of 6’’ LPG Pipeline From hanibalGas plant to Gabes
  • 20 Km of 18’’ Multiphase and Gas Pipelines From hanibal Gas plant to Ben Sahloul

Client : BG TUNISIA

Location : Sfax/Gabes

Completion Date : 2009

PROJECT : Gas Pipeline

Project  Overview :

Engineering, procurement  and construction of 4 Km

Pipeline Interconnection from Djebel Grouz to pipeline 10″ STEG

10 Km of 12″ Flowline Construction From Oued Zar to Trapsa

9 Km of 12″ Pipeline Construction From Oued Zar to Trapsa

 Client : ENI

Location : Oued Zar

Completion Date : 2008

 

PROJECT : Gas Pipeline

Project  Overview :

3 km of 8  » Pipeline Construction Oued Zar El Borma including EPC manifold & related piping HP at Oued Zar.

 Client : ENI

Location : El Borma

Completion Date : 2007

 

PROJECT : Gas Pipeline

Project  Overview :

 

Project Engineering, procurement and construction
Loop 10’’ Gaz Pipeline from OUM CHIAH Gaz to LPG Gaz plant LL

 Client : PERENCO

Location : Oum Chiah -Gabes

Completion Date : 2006

 

PROJECT : Gas pipelines interconnection

Project  Overview :

  • Gas pipeline looping:
  • 10 Km of 20″ diam pipeline and related civil works at El Mourouj.
  • 12 Km of 8″ diam pipeline and related civil works at Jbel El Oust.
  • 5 Km of 4 » diam pipeline and related civil works in Denden city.
  • 4 Km of 12″ diam pipeline and related civil works from La Goulette to Radés, including 500 m of horizontal drilling.
  • 13 Km of 20” diameter , 11.2 mm thick pipe+ fiber optic cable
  •  5 km of 16 “ diameter , 9.2 mm thick pipe .

Client : STEG

Location : Tunis & Suburbains

Completion Date : 2000-2004

 

 

PROJECT : EL Franig/Baguel Development-Pipeline project

Project  Overview :

Designed to transport gas and condensate from two distant fields in the Tunisian desert, this project was completed in six months. . Activities included Survey & right of way, pipe transport & stinting, welding & NDT, coating, lowering-in and backfilling, installation of pig scrapers, block valves hydro-testing, tie-in to existing lines and pre-commissioning.

Two main segments were included in this pipeline:

  • 116 km of 10” FBE coated pipe from El franig wellhead to the CPF.
  • 5 Km of 6” FBE coated pipe from Bagel wellhead to junction point .

 

Client : CMS NOMECO

Location : Douz ( South Tunisia)

Completion Date : 1998

 

PROJECT : LPG Recovery system

Project  Overview :

  • 300 Km of 6” pipeline transporting

L.P.G from El Borma production field to the fractionating plant in Gabes .

  • 50 Km of 6” flow lines .
  • The construction of the pipeline included in field coating, pipe laying through rocky mountains and major rivers, special points, installation of pig launchers & receivers and cathodic protection etc.

Client : STEG

Location : El Borma –Gabes

Completion Date : 1985