Project Overview
EPC project (In JV With MS Italy) Gas Pipeline construction for the interconnection of Nawara CPF to the GTP Gabes the projet include Western Gas Pipeline from Nawara to Gabès GTP (370 Km 24”)
- 2 pig stations (launchers & receivers).
- 12 block valve stations.
- Control and Telecommunications Systems
- Fibre-Optic Cable
PROJECT
- Km 24”
Gas Pipeline Nawara– Gabes
Client
- OMV
Location
- Nawara – Gabes
- Completion DateIn Progress
Project Overview
Gas Pipeline for the interconnection of Coal mines in the Gafsa valley : Engineering, Procurement, Construction, testing, commissioning and Start-up for 95 Km of 20” & 75 Km of 8” Gas Pipeline From Feriana to Gafsa
PROJECT
- 95 Km 20” 75 Km 8” Gas Pipeline
- Feriana – Gafsa
Client
- STEG
Location
- Coal mines in Gafsa valley
Completion Date
- 2016
Project Overview
150 Km of 12” Pipeline from Gabés
to Zarziz
Construction , Testing &
commissioning of 155 Km of 12 »
pipeline from Gabés to Zarzis
including:
- 2 pig stations (launchers & receivers).
- 5 block valve stations.
-
- 2 pig stations (launchers &receives).33 block valve stations block valve stations.Facility & metering system.PROJECT155 Km 12” Gas Pipeline Gabés – Djerba – Zarzis
Client
STEG
Location
Gabés – Djerba – Zarzis
Completion Date
2016
- 2 pig stations (launchers &receives).33 block valve stations block valve stations.Facility & metering system.PROJECT155 Km 12” Gas Pipeline Gabés – Djerba – Zarzis
-
Project Overview
Engineering, Procurement, Construction , Testing & commissioning of 8 » pipeline from Hannibal Gas Plant – TRAPSA Terminal.
- 58 Km of 8’’ condensate pipeline and associated works from Hannibal plant (sfax) to Trapsa Terminal(Skhira).
- 2 pig stations (launchers &receives).
- 33 block valve stations block valve stations.
- Facility & metering system.
PROJECT
8” Pipeline from Hannibal Gas Plant TRAPSA terminal
Client
BG TUNISIA
Location
Hannibal Gas Plant-TRAPSA Terminal
Completion Date
2006
Project Overview
- Hasdrubal Project : 260 Km of 6’’ LPG Pipeline From hanibalGas plant to Gabes
- 20 Km of 18’’ Multiphase and Gas Pipelines From hanibal Gas plant to Ben Sahloul
PROJECT
- LPG & Gas
- Pipeline
Client
- BG TUNISIA
Location
- Sfax/Gabes
Completion Date
2009
Project Overview
vEngineering, procurement and construction of 4 Km
vPipeline Interconnection from Djebel Grouz to
pipeline 10″ STEG
v10 Km of 12″ Flowline Construction From Oued Zar to Trapsa
v9 Km of 12″ Pipeline Construction From Oued Zar to Trapsa
PROJECT
- Gas Pipeline
Client
- ENI
Location
- Oued Zar
Completion Date
- 2008
Project Overview
- Gas pipeline looping:
- 10 Km of 20″ diam pipeline and related civil works at El Mourouj.
- 12 Km of 8″ diam pipeline and related civil works at Jbel El Oust.
- 5 Km of 4 » diam pipeline and related civil works in Denden city.
- 4 Km of 12″ diam pipeline and related civil works from La Goulette to Radés, including 500 m of horizontal drilling.
- 13 Km of 20” diameter , 11.2 mm thick pipe+ fiber optic cable
5 km of 16 “ diameter , 9.2 mm thick pipe .
PROJECT
Gas pipelines
interconnection
Client
STEG
Location
Tunis &Suburbains
Completion Date
2000-2004
PROJECT
Pipelines Gaz
Completion Date
2006
Project Overview
Designed to transport gas and condensate from two distant fields in the Tunisian desert, this project was completed in six months. . Activities included Survey & right of way, pipe transport & stinting, welding & NDT, coating, lowering-in and backfilling, installation of pig scrapers, block valves hydro-testing, tie-in to existing lines and pre-commissioning.
Two main segments were included in this pipeline:
- 116 km of 10” FBE coated pipe from El franig wellhead to the CPF.
- 5 Km of 6” FBE coated pipe from Bagel wellhead to junction point .
PROJECT
- EL Franig/ Baguel Development-Pipeline project
Client
- CMS
- NOMECO
Location
- Douz
- ( South Tunisia)
Completion Date
- 1998
Project Overview
- 300 Km of 6” pipeline transporting
L.P.G from El Borma production field to the fractionating plant in Gabes .
- 50 Km of 6” flow lines .
- The construction of the pipeline included in field coating, pipe laying through rocky mountains and major rivers, special points, installation of pig launchers & receivers and cathodic protection etc.
PROJECT
- LPG
- Recovery
- system
Client
- STEG
Location
- El Borma –Gabes
Completion Date
1985