Project Overview
EPC Contract for 8 pile drilling and production platform for Ashtart field.
- Construction and erection of 2000 tons of
Fabrication and erection of 200 tons of piping.
- Equipment installation and connection including
- 2 sets of turbo generators of 3MW.
- 2 turbo pumps
- Fuel gas and diesel oil treatment units
- Compressed air and chemical units
- Construction and installation of electrical and control rooms.
- Electrical and instrumentation works.
- Painting and insulation.
- Sea fastening and load out.
- All work certified by DNV.
Project Overview
EPC Contract for 8 pile drilling and production platform for Ashtart field.
- Construction and erection of 2000 tons of
Fabrication and erection of 200 tons of piping.
- Equipment installation and connection including :
- 2 sets of turbo generators of 3MW.
- 2 turbo pumps
- Fuel gas and diesel oil treatment units
- Compressed air and chemical units
- Construction and installation of electrical and control rooms.
- Electrical and instrumentation works.
- Painting and insulation.
- Sea fastening and load out.
All work certified by DNV
PROJECT
- Complementary of Development Of the Ashtart Field (ASPF 2)
Client
- Elf Aquitaine – ETAP (SEREPT)
Location
- Port of Gabes
Completion Date
- 1986
Project Overview
EPC Contract for 8 pile drilling and production platform for Ashtart field.
- Construction and erection of 2000 tons of
Fabrication and erection of 200 tons of piping.
- Equipment installation and connection including :
- 2 sets of turbo generators of 3MW.
- 2 turbo pumps
- Fuel gas and diesel oil treatment units
- Compressed air and chemical units
- Construction and installation of electrical and control rooms.
- Electrical and instrumentation works.
- Painting and insulation.
- Sea fastening and load out.
- All work certified by DNV.
Project Overview
Complete conversion and up fitting of an oil tanker to a fully integrated and functioning floating production & storage facility and offloading system (FPSO).
The turn key project consisted of :
- Construction of a main production platform.
- Construction of a flare scrubber platform .
- Installation of a production facility including process and utility piping, tanks, mechanical equipment, and fire fighting system .
- Construction of a Helideck .
- Installation of electrical equipments, instrument and control system.Testing and Commissioning.
PROJECT
- DIDON
- Field Development
- FPSO
Client
- MEDEX PETROLEUM ZARAT
Location
- Port of Zarzis
- (South Tunisia)
Completion Date
- 1997