Offshore Platforms

Project Overview

EPC Contract for 8 pile drilling and production platform for Ashtart field.

  • Construction and erection of 2000 tons of

Fabrication and erection of 200 tons of    piping.

  • Equipment installation and connection including
  • 2 sets of turbo generators of 3MW.
  • 2 turbo pumps
  • Fuel gas and diesel oil treatment units
  • Compressed air and chemical units
  • Construction and installation of electrical and control rooms.
  • Electrical and instrumentation works.
  • Painting and insulation.
  • Sea fastening and load out.
  • All work certified by DNV.

Project Overview

EPC Contract for 8 pile drilling and production platform for Ashtart field.

  • Construction and erection of 2000 tons of

Fabrication and erection of 200 tons of    piping.

  • Equipment installation and connection including :
  • 2 sets of turbo generators of 3MW.
  • 2 turbo pumps
  • Fuel gas and diesel oil treatment units
  • Compressed air and chemical units
  • Construction and installation of electrical and control rooms.
  • Electrical and instrumentation works.
  • Painting and insulation.
  • Sea fastening and load out.

All work certified by DNV

PROJECT

  • Complementary of Development Of the Ashtart Field (ASPF 2)

Client

  • Elf Aquitaine – ETAP (SEREPT)

Location

  • Port of Gabes

Completion Date

  • 1986

Project Overview

EPC Contract for 8 pile drilling and production platform for Ashtart field.

  • Construction and erection of 2000 tons of

Fabrication and erection of 200 tons of    piping.

  • Equipment installation and connection including :
  • 2 sets of turbo generators of 3MW.
  • 2 turbo pumps
  • Fuel gas and diesel oil treatment units
  • Compressed air and chemical units
  • Construction and installation of electrical and control rooms.
  • Electrical and instrumentation works.
  • Painting and insulation.
  • Sea fastening and load out.
  • All work certified by DNV.

Project Overview

Complete conversion and up fitting of an oil tanker to a fully integrated and functioning floating production & storage facility and offloading system (FPSO).

The turn key project consisted of :

  • Construction of a main production platform.
  • Construction of a flare scrubber platform .
  • Installation of a production facility including process and utility piping, tanks, mechanical equipment, and fire fighting system .
  • Construction of a Helideck .
  • Installation of electrical equipments, instrument and control system.Testing and Commissioning.

PROJECT

  • DIDON
  • Field Development
  • FPSO

Client

  • MEDEX PETROLEUM ZARAT

Location

  • Port of Zarzis
  • (South Tunisia)

Completion Date

  • 1997