High Voltage Tower Transmission Lines – STEG (Sfax / Tunisia & Liby en 2001)
Length:…. km, / Voltage: 225 KV – …KV High …Lire la suite »High Voltage Underground Cables – Pirelli / Nexans (Tunis/Goulette/Kram/ Mnihla)
Length: 32 km, / Voltage: 225 KV High Voltage …Lire la suite »High Voltage Tower Transmission Lines – STEG (North East & West of Tunisia)
Length: 220 km, / Voltage: 400 KV Length: 70 km …Lire la suite »High Voltage Tower Transmission Lines – STEG (North & Center West of Tunisia)
Length: 127 km, / Voltage: 225 KV Length: 274 km …Lire la suite »High pressure gas pipeline OMV (CPF Nawara – GTP Gabes)
Gas Pipeline construction for the interconnection of Nawara CPF to …Lire la suite »High Voltage Tower Transmission Line – STEG (Mdhila – Tozeur)
Project Overview : High Voltage tower installation including civil work, …Lire la suite »HIGH VOLTAGE TOWER –STEG/JYOTI (North West & Center West of Tunisia)
Project Overview : High Voltage tower installation including civil work …Lire la suite »HIGH VOLTAGE TOWER – STEG/KEC (North East & West of Tunisia)
Project Overview : High voltage tower installation (Lot 1 & …Lire la suite »HIGH VOLTAGE TOWER -STEG (Sfax/Medenin)
Project Overview : Construction of 225/400 KV Over head Power …Lire la suite »High Voltage Underground Cables – Pirelli / Nexans (Rades/Grombalia – Tunis/Rades/Bizerte)
Project Overview : High Voltage underground cable laying Length – …Lire la suite »HIGH VOLTAGE UNDERGROUND CABLES (Tunis/Goulette/Kram/Mnihla)
Project Overview : High Voltage underground cable laying Length : …Lire la suite »