Catégorie : Hight

Oct - 25
2017

High pressure gas pipeline OMV (CPF Nawara – GTP Gabes)

Gas Pipeline construction for the interconnection of Nawara CPF to the GTP Gabes. Length: 370 km, 24’’ Engineering, Procurement, Construction, testing, commissioning and Start-up including pig stations, valve stations, control & telecommunications systems, fiber optic cable and crossings.    

Oct - 11
2017

HIGH VOLTAGE TOWER -STEG (Sfax/Medenin)

Project Overview : Construction of 225/400 KV Over head Power Transmission Line Interconnection between Tunisia & Libya Length  : 336 Km  / Voltage  : 225 & 400 Kv Client : STEG Location : Sfax/Medenin Completion Date : 2001