Oct - 25
2017
Gas Pipeline construction for the interconnection of Nawara CPF to the GTP Gabes. Length: 370 km, 24’’ Engineering, Procurement, Construction, testing, commissioning and Start-up including pig stations, valve stations, control & telecommunications systems, fiber optic cable and crossings.
Oct - 25
2017
High pressure gas pipeline STEG (Feriana – Gafsa) Gas Pipeline Construction for the interconnection of Coal mines in Gafsa valley. Length: 95 km, 20 » 75 km, 8 » Engineering, Procurement, Construction, testing, commissioning and Start-up including valve stations and crossings. PROJECT: 95…
Oct - 25
2017
High pressure gas pipeline STEG (Gabes – Zarzis) Gas Pipeline Construction from Gabés to Zarzis Length: 155 km, 12 » Civil and pipeline construction works including 2 pig stations (launchers & receivers), 5 block valve stations and Facility & metering system.…
Oct - 25
2017
Condensate pipeline BG Tunisia (Sfax – Skhira) Condensate Pipeline Construction from Hannibal Gas Plant to TRAPSA Terminal. Length: 60 km, 8’’ Engineering, Procurement, Construction, testing, commissioning including 2 pig stations (launchers & receivers), 33 block valve stations, Facility & metering…
Oct - 25
2017
Construction of Two parallel LPG Pipelines from Hasdrubal Plant to GABES Terminal. Length: 260 Km, 6’’ (130 km x 2) Engineering, Construction, testing and commissioning including special crossings.
Oct - 25
2017
Multiphase and Gas Pipelines BG Tunisia (Hannibal GP – Ben Sahloun) Gas pipeline construction From Hannibal Gas plant to Ben Sahloul. Length: 20 Km, 18’’ Engineering, Construction, testing and commissioning PROJECT: Multiphase and Gas Pipelines BG Tunisia (Hannibal GP –…