Auteur : BI

Oct - 25
2017

LPG pipeline BG Tunisia (Sfax – Gabes)

  Construction of Two parallel LPG Pipelines from Hasdrubal Plant to GABES Terminal. Length: 260 Km, 6’’ (130 km x 2) Engineering, Construction, testing and commissioning including special crossings.