Auteur : BI

Oct - 25
2017

High pressure gas pipeline OMV (CPF Nawara – GTP Gabes)

Gas Pipeline construction for the interconnection of Nawara CPF to the GTP Gabes. Length: 370 km, 24’’ Engineering, Procurement, Construction, testing, commissioning and Start-up including pig stations, valve stations, control & telecommunications systems, fiber optic cable and crossings.    

Oct - 25
2017

DIDON Field Development FPSO

PROJECT : DIDON Field Development FPSO EPC Contract for 8 pile drilling and production platform for Ashtart field.  Construction and erection of 2000 tons of structure.  Fabrication and erection of 200 tons of piping.  Equipment installation and…

Oct - 25
2017

High pressure gas pipeline STEG (Feriana – Gafsa)

High pressure gas pipeline STEG (Feriana – Gafsa) Gas Pipeline Construction for the interconnection of Coal mines in Gafsa valley. Length: 95 km, 20 » 75 km, 8 » Engineering, Procurement, Construction, testing, commissioning and Start-up including valve stations and crossings. PROJECT: 95…

Oct - 25
2017

High pressure gas pipeline STEG (Gabes – Zarzis)

High pressure gas pipeline STEG (Gabes – Zarzis) Gas Pipeline Construction from Gabés to Zarzis Length: 155 km, 12 » Civil and pipeline construction works including 2 pig stations (launchers & receivers), 5 block valve stations and Facility & metering system.…

Oct - 25
2017

Condensate pipeline BG Tunisia (Sfax – Skhira)

Condensate pipeline BG Tunisia (Sfax – Skhira) Condensate Pipeline Construction from Hannibal Gas Plant to TRAPSA Terminal. Length: 60 km, 8’’ Engineering, Procurement, Construction, testing, commissioning including 2 pig stations (launchers & receivers), 33 block valve stations, Facility & metering…