2020

High Voltage Tower Transmission Lines – STEG (Sfax / Tunisia & Liby en 2001)
Length:…. km, / Voltage: 225 KV – …KV High Voltage tower transmission line installation including Civil work, Tower Erection, Cable Stringing …
Length:…. km, / Voltage: 225 KV – …KV High Voltage tower transmission line installation including Civil work, Tower Erection, Cable Stringing …
Length: 32 km, / Voltage: 225 KV High Voltage tower transmission line installation including Civil work, Tower Erection, Cable Stringing …
Length: 220 km, / Voltage: 400 KV Length: 70 km / Voltage: 225 KV Length: 150 km / Voltage: 150 KV High Voltage tower transmission line installation including Civil work, Tower Erection, Cable Stringing …
Length: 127 km, / Voltage: 225 KV Length: 274 km / Voltage: 150 KV Length: 375 km / Voltage: 90 KV High Voltage tower transmission line installation including Civil work, Tower Erection, Cable Stringing …
Engineering, procurement and construction of an Crude Oil Storage Tanks 5 000 m3 Total Capacity : 5 000 M3 Civil work, Mechanical work, Electrical & Instrumentation, Control System, Fire fighting system…
Project total size: 1.5 MWp Design, Supply and Installation of PV Solar System for 12 Line Valve Stations (LVS) under NAWARA pipeline project.