High pressure gas pipeline OMV (CPF Nawara – GTP Gabes)

Oct - 25
2017

High pressure gas pipeline OMV (CPF Nawara – GTP Gabes)

BI

Gas Pipeline construction for the interconnection of Nawara CPF to the GTP Gabes.
Length: 370 km, 24’’
Engineering, Procurement, Construction, testing, commissioning and Start-up including pig stations, valve stations, control & telecommunications systems, fiber optic cable and crossings.

 

 