DIDON Field Development FPSO
PROJECT : DIDON Field Development FPSO
EPC Contract for 8 pile drilling and production platform for Ashtart field.
Construction and erection of 2000 tons of structure.
Fabrication and erection of 200 tons of piping.
Equipment installation and connection including :
2 sets of turbo generators of 3MW.
2 turbo pumps
Fuel gas and diesel oil treatment units
Compressed air and chemical units
Construction and installation of electrical and control rooms.
Electrical and instrumentation works.
Painting and insulation.
Sea fastening and load out.
Client : MEDEX PETROLEUM ZARAT
Location : Port of Zarzis (South Tunisia)