DIDON Field Development FPSO

Oct - 25
2017

DIDON Field Development FPSO

BI

PROJECT : DIDON Field Development FPSO

EPC Contract for 8 pile drilling and production platform for Ashtart field.
 Construction and erection of 2000 tons of structure.
 Fabrication and erection of 200 tons of piping.
 Equipment installation and connection including :
 2 sets of turbo generators of 3MW.
 2 turbo pumps
 Fuel gas and diesel oil treatment units
 Compressed air and chemical units
 Construction and installation of electrical and control rooms.
 Electrical and instrumentation works.
 Painting and insulation.
 Sea fastening and load out.

Client : MEDEX PETROLEUM ZARAT

Location : Port of Zarzis (South Tunisia)

Laisser un commentaire

Votre adresse de messagerie ne sera pas publiée. Les champs obligatoires sont indiqués avec *