Engineering, Procurement and Construction of Four Crude Oil Tanks of 58 000m3 each with floating roofs.

(4 X 58 000 m3)
Total Capacity: 232 000 m3

Project Overview

Design, engineering, procurement and construction of a tank farm.

The work included :

  • 4 crude oil storage tanks with

floating roofs and a capacity of 58 000 m3 each.

  • A complete fire fighting system.
  • All interconnecting piping an mechanical works.
  • All electrical & instrumentation works .

PROJECT: Tank Farm

Client: MINISTRY OF OIL(IRAK)

Location: El Bassora Terminal -Irak

Completion Date: 2002

 

 

 

 

 

 

 

 